Lift Construction Rises to 51 in 2017

TomWhiteTomWhite expert
in NELSAP Forum Posts: 581
Peter Landsman full article at Liftblog.com is carried in full at ropeways. First para. below.


Construction Rises Significantly to 51 Lifts in 2017

With commissioning wrapping on eleven more lifts than last year at this time, 2017 represents an impressive ten-year high for North American lift building.  Six-passenger chairlifts, T-Bars and urban gondolas in Mexico and the Caribbean drove much of the growth in a year that saw continued changes in the manufacturer landscape.  Compared with 2016, more of this year’s chairlifts were expensive detachable models (12) compared with 17 fixed-grips (in 2016, the split was 7 detachable, 23 fixed.)  A total of nine new gondolas and three T-Bars went up in 2017, both increases from the year before.  Ten additional lifts were relocated and re-purposed, a three-year high with lifts originally built by Blue Mountain, CTEC, Doppelmayr, Riblet, Roebling, Stadeli and Yan finding new homes.  Combined, this year’s new lift class represents a solid 27 percent increase from 2016.

Comments

Sign In or Register to comment.