Sun Mountain Express Damaged by Wind Gust

Comments

  • DrJeffDrJeff advanced
    Posts: 383
    Per a post on AZ from the communications folks at Bromley,  the replacement parts from Doppelmayr will be arriving today, and should be finished installing soon there after, and if all goes as planned, the lift will be inspected by the state of VT this afternoon and once again operational hopefully this afternoon....  Hope it works for them as planned!
  • lotsoskiinglotsoskiing expert
    Posts: 1,137
    You can still get to summit via 2 lifts, correct?
  • slathamslatham advanced
    Posts: 180

    You can still get to summit via 2 lifts, correct?



    Yes Blue Ribbon fixed grip quad also goes to top. Take Alpine lift (1/2 way up) or Sun Lift (3/4 way up) and ski to lift riders right to the quad.
Sign In or Register to comment.