ORDA Upgrades
Whiteface upgrades this offseason include the Upgrading of towers and footings below mid-station and replacement of the Little Whiteface double chairs with newer fixed chairs. Also Interesting is there is no mention of the ground breaking of the base lodge at North Creek, but an upgraded gondola system with all new cabins. Most every area is focusing on snowmaking upgrades.
https://www.pressrepublican.com/news/orda-board-oks-26m-for-venue-updates/article_16b943aa-fc32-11ee-a908-136717fe0636.html
https://www.pressrepublican.com/news/orda-board-oks-26m-for-venue-updates/article_16b943aa-fc32-11ee-a908-136717fe0636.html
~Rich~
Comments
The Gore detach was funded and contracted in 2023 but ORDA delayed it to this year and construction is starting now. The Little Whiteface double was put out to bid this spring for 2024 but Doppelmayr was the only bidder with a very high number. ORDA put it back out to bid for 2025 hoping for some competition and lower pricing. That one definitely won't be installed this year.
First, the base around the Village Chair and the soon to be removed Hudson Chair is now fenced off:
The site for the new lodge is mostly cleared out, about 200' NNE of the base of the Village Chair. This is where the old yurt used to be. Right side of photo.
Here's a view of the Village Chair, with the site for the new lodge behind it:
The chairs have been removed from the Hudson Chair:
Looking up the Hudson Chair line:
The Hudson Chair chairs are now in the turnaround near the base of the lift. I would imagine they'll be going to McCauley soon.
There is no sign yet of work to clear a new lift line.
This is exciting to see. Can't wait to next season!
https://goremountain.com/the-mountain/improvements/
yikes
Maybe the land didn't get reclassified? It says requested so assuming if it did not then they would not be able to expand into that area.
That lift would be such a game changer...avoiding Pipeline. It could also be used for summer activities too to connect both areas. It would be 9000' or more in length. Unfortunately, I doubt it will ever come to fruition.
Heard back from ORDA. The New Quad will replace the existing line and will not be extended. The Triple is currently being delivered to McCauley.